Orglith

DEEN

Request a conversation

What you’re looking for

Six tenders. One question.

Structural work gets procured in pieces, because nothing existed that could answer it whole. This page sorts the terms the pieces are tendered under back into the question they share.

Strategy and operating model

Target Operating Model · TOM · Operating model design · Strategy execution · Transformation program · Synergy assessment · Group structure

The question is: which operating model carries this strategy — and what does the path there cost? It gets asked at the top and answered at the bottom, in every single position.

Perspective · Decision

Organization and structure

Organization design · Org design · Reorganization · Restructuring · Span of control · Layers and spans · De-layering · Centralization · Shared services · Target organization

The question is: how should this organization be cut? Every answer to it moves roles, capacity and cost — usually in positions the proposal never mentions.

All ten situations

Workforce demand and planning

Strategic Workforce Planning · SWP · Headcount planning · FTE planning · Workforce demand modeling · Personnel cost planning · Scenario planning · Gap analysis · Succession planning

The question is: how many people with which capabilities does this structure need, and by when? Apart from the structural decision it has no answer, because the structure is what creates the demand.

Perspective · Workforce

Roles and capabilities

Job architecture · Job leveling · Job grading · Role model · Role taxonomy · Competency framework · Capability model · Skills taxonomy · Future skills · Skills-based organization

The question is: which roles should exist, and what must they be able to do? A role taxonomy without the structure it holds in is a catalog — useful, but it cannot carry a decision.

Perspective · Workforce

Sourcing and vertical integration

Make-or-buy · Outsourcing · BPO · Business process outsourcing · Vertical integration · Offshoring · Nearshoring · Global capability center · Insourcing

The question is: what stays in house? The unit cost is the only figure that arrives in comparable form — and the one that says least about what the move does everywhere else.

Situation 08 · Make-or-Buy

Artificial intelligence and the division of labor

Automation potential · Substitution potential · Task analysis · Activity-level assessment · AI impact on roles · Reskilling demand

The question is: which activities does software take over, and which structure is left standing? That is not a question about how AI-ready the organization is, but about the shape it has afterwards.

Situation 03 · GenAI and structure

Why six

The split is no accident. It is a consequence.

Nobody decided that operating model, role model, workforce demand and sourcing were to be settled apart from one another. They were separated until each piece could be procured on its own — because nothing existed that resolved them as one.

That six tenders circle the same question is therefore not a procurement error. It is the imprint of a limit.

Each of the six pieces stays necessary. None of them alone carries the decision you are procuring it for.

The Standard

If you are searching under one of these terms, bring the decision that stands behind it.

Request a conversation